Hi! I have a shop running on Prestashop 8.2, and I want to change the colors of the order statuses in the back office. I noticed that some statuses come with default colors (like green for "Delivered" and red for "Canceled"), but I’d like to customize them to my preferences.
I checked Orders > Statuses, where there’s an option to choose a color, but changing it there doesn’t seem to apply everywhere. I assume there’s a way to modify this via CSS or directly in the template.
Has anyone done this before? Do I need to manually edit a CSS file, or is there a setting I might have missed?
Thanks in advance!
I checked Orders > Statuses, where there’s an option to choose a color, but changing it there doesn’t seem to apply everywhere. I assume there’s a way to modify this via CSS or directly in the template.
Has anyone done this before? Do I need to manually edit a CSS file, or is there a setting I might have missed?
Thanks in advance!
